Home
About Chenxing
Company Introduction
Chenxing Advantage
Corporate culture
Development History
Certification
Partner
Product Center
Steel wire brush
Steel plate brush
Composite brush
Grouting stopper
Service
Project Achievements
Blog
Company News
Industry News
Contact Us
Knowledge
2025/07/17
China Railway Equipment’s first-ever export of a large-diameter tunnel boring machine to South America has been a resounding success!
Recently, good news came from Section 1 of the extension project for Metro Line 2 in São Paulo, Brazil: the large-diameter earth-pressure balanced tunnel boring machine “China Railway No. 1207,” developed by China Railway Equipment, has successfully completed the first-phase tunneling task of Section 1.
Read more
2025/07/15
The “Funes” earth-pressure balanced dual-mode tunnel boring machine developed by China Railway Equipment.
On July 15, 2025, the “Funes,” a soil-pressure open-type dual-mode tunnel boring machine developed by China Railway Equipment, successfully started tunneling at the Fortezza railway tunnel project in Italy, marking the official entry of the project into the TBM construction phase.
2025/07/12
The open-type TBM “Yunding No. 2” from CCCC Tianhe has successfully completed tunneling through Southeast Asia’s longest tunnel.
On July 12, the company’s open-type TBM “Yunding No. 2” successfully completed tunneling through the Yunding Tunnel—the longest tunnel in Southeast Asia—on Malaysia’s East Coast Rail Link. The company’s shield machines are accelerating their “going global” efforts, continuously providing high-quality, cutting-edge engineering equipment and full-industry-chain services to support global connectivity and contributing to the high-quality joint construction of the Belt and Road Initiative.
2025/07/01
The “Qihang” dual-shield TBM has achieved a monthly advance of 701.8 meters on the Kaisaka Water Diversion Tunnel Project in the Philippines, setting a new record for tunneling progress!
Recently, we received news from the front lines of the Kaisaka Water Diversion Tunnel project in the Philippines! The “Qihang” dual-shield hard-rock TBM with an excavation diameter of 3.86 meters, developed by our company, achieved an impressive breakthrough of 701.8 meters in June, setting a new record for tunneling performance among small-diameter dual-shield TBMs of the same type.
Online consultation
*Note: Please be sure to fill in the information accurately and keep your communication channels open. We will contact you as soon as possible.