New Zhengzhou Airport-Zhengzhou South Station Intercity Railway Tunnel

The project boasts numerous technological innovation highlights—it is China’s first intercity railway tunnel project featuring a dual-track, large-diameter shield tunnel. The tunneling machine has been equipped with a world-first six-axis underwater special-operation robot, which can effectively clean the cutterhead and solve the challenging problem of mud cake buildup. The tunnel passes through highly risky critical infrastructure, including a close proximity underpass beneath the central route of the South-to-North Water Diversion Project’s main canal. At this location, the tunnel arch is only 26 meters above the canal’s bottom, where the water pressure is 40 times higher than normal during tunneling. Moreover, the settlement must be kept within a strict limit of no more than 9 millimeters. To achieve this, the project team set up a pilot section and introduced advanced automated monitoring technologies, ultimately controlling the settlement in the underpass section to within 2.5 millimeters—a remarkable feat that ensured safe passage. The tunneling efficiency has reached unprecedented levels: the daily advance rate has been increased from an average of 3 rings per day to 7 rings per day, setting new national records for intercity railway tunnels, including a single-day advance of 22 meters, a monthly advance of 410 meters, and a one-time safe advance of 3,800 meters using large-diameter dual-track shield tunneling technology.

Read more

2025/12/24

Hengyang Second Ring Road Hejiangtou Xiangjiang Tunnel

The longitudinal gradient design presents a level of difficulty rarely seen nationwide. With a tunnel gradient reaching 5.0%, this is China’s largest “V-shaped” longitudinal-gradient, large-section slurry shield tunnel crossing the river. Such an extreme gradient poses extraordinarily high technical challenges for shield launching, and makes it particularly difficult to adjust the shield’s attitude during tunneling—especially during the “upward” driving phase, where precise parameter control is crucial. The geological conditions are exceptionally complex: the tunnel is located at the confluence of three major rivers—the Xiangjiang, Leishui, and Zhengshui—and must pass through unfavorable geological formations including karst regions, fractured zones, and strata that are soft on top and hard below. Moreover, the tunnel faces the challenge of groundwater corrosiveness. Additionally, the launch shaft is situated close to the eastern embankment of the Xiangjiang River, raising the risk of river water seeping into the excavation pit and compromising structural stability. The core technologies employed here are internationally leading; notably, the innovative use of silane impregnation technology for corrosion protection of tunnel segments—a technique commonly used in port engineering—is being applied for the first time to underground tunnel corrosion protection. Furthermore, the newly developed “grouting and compaction method for replacing low-density fill materials in riverbed cavities” has also reached an internationally advanced level.

Read more

2025/12/24

Beijing-Tianjin Intercity Extension Project Section 3

The section of the project is located in a coastal alluvial plain, where the geological strata are predominantly composed of clay, silty clay, and silty loam. These soil types exhibit high sensitivity and low strength, with relatively high compression coefficients, making them highly susceptible to creep and disturbance. During tunnel boring machine (TBM) excavation, they can easily induce ground deformation, posing significant challenges to tunneling operations and the stability of surrounding rock masses. In this section, the upper layer contains Quaternary unconfined groundwater, while the underlying fine sand and silt layers harbor slightly pressurized groundwater. The tunnel runs directly beneath Jiefang Road’s commercial district, requiring continuous side or undercrossing of 32 commercial buildings. Along the route, eight locations have been identified as having extremely high risk levels, and five others as having high risk levels. Meanwhile, beneath the surface, there are 45 underground pipelines carrying electricity, water supply, gas, and other utilities; among these, 18 pipelines require special reinforcement measures. The minimum curve radius for the TBM tunnel is only 450 meters, accounting for nearly 25% of the total tunnel length. Furthermore, the project employs a large-diameter TBM with a diameter of 11.97 meters—a configuration that has no precedent yet in domestic tunnel construction projects using tunnels of similar diameters.

Read more

2025/12/24

Lion Ocean Tunnel of the Guangzhou-Shenzhen-Hong Kong Express Rail Link

This is China’s first underwater railway tunnel constructed using shield tunneling technology. It marks the first time that large-diameter shield tunneling technology has been applied to the construction of a high-speed railway tunnel beneath water. Moreover, the project innovatively adopted a tunneling method known as “tunneling from opposite directions, underground docking, and in-tunnel dismantling,” setting a pioneering industry standard for precise underwater shield tunneling and in-tunnel dismantling. The tunneling operation was carried out beneath the main channel of the Shiziyang Strait, which is 3,300 meters wide and has a maximum water depth of 26.6 meters, facing a high hydrostatic pressure of 0.67 MPa. The geological strata traversed consist primarily of argillaceous siltstone and sandstone, interspersed with weak, "tofu-like" formations, numerous fault zones, and deeply weathered grooves. Additionally, the tunnel passes through sections with exceptionally shallow burial depths—where the tunnel crown is only 7 to 9 meters above the seabed—posing an extremely high risk of collapse. The project successfully overcame several globally challenging issues, including pressurized cutterhead replacement under water conditions. The comprehensive set of technologies developed during this project has been granted multiple patents and will subsequently be widely applied to more than 250 kilometers of composite-strata shield tunnels across China.

Read more